Listen to this story

Subscriber Benefit

As a subscriber you can listen to articles at work, in the car, or while you work out. Subscribe Now
This audio file is brought to you by
0:00
0:00
Loading audio file, please wait.
  • 0.25
  • 0.50
  • 0.75
  • 1.00
  • 1.25
  • 1.50
  • 1.75
  • 2.00

The Indiana Department of Transportation plans to open newly-paved lanes of Interstate 65 in Bartholomew and Jackson counties within a couple of weeks. The state’s $143 million Columbus-to-Seymour 65 Next Level project will eliminate the southbound median crossover near the Walesboro exit on December 7. Southbound traffic will remain on the west side of I-65 and the new winter configuration will continue throughout the winter. 

New configuration includes:

  • The asphalt section between S.R. 46 ramps at Columbus and mile marker 64.5 near the Walesboro exit will remain in normal configuration—two 12-foot lanes southbound and northbound with 4-foot inside shoulders and 8-foot outside shoulders.
  • MM 64.5 to 61.2 at Smalls Creek bridge—two 11-foot lanes southbound and northbound with 2-foot shoulders.
  • MM 61.2 to 56.0 just north of S.R. 11—two 11-foot lanes southbound and northbound with 4-foot inside shoulders and 8-foot outside shoulders.
  • MM 56.0 to 53.3 at White River bridge—two 11-foot lanes southbound and northbound with 2-foot shoulders.
  • MM 53.5 to 50.0 at U.S. 50/Seymour—two 11-foot lanes southbound and northbound with 4-foot inside shoulders and 8-foot outside shoulders.

Orange barrels will continue to restrict traffic while work continues throughout the construction zone this winter, including subgrade work for an added northbound lane and bridge work at the White River and the L & I Railroad underpass. 

The 3-year project includes construction of a 6-lane concrete roadway between U.S. 50 and S.R. 58, along with pavement repairs and resurfacing of a 4-lane section between S.R. 58 and S.R. 46. 

Story Continues Below

CYBER WEEK SPECIAL: 50% OFF a subscription to both Inside INdiana Business + IBJ. GET DEAL

CYBER WEEK SPECIAL: 50% OFF a subscription to both Inside INdiana Business + IBJ. GET DEAL

CYBER WEEK SPECIAL: 50% OFF a subscription to both Inside INdiana Business + IBJ. GET DEAL

CYBER WEEK SPECIAL: 50% OFF a subscription to both Inside INdiana Business + IBJ. GET DEAL

CYBER WEEK SPECIAL
TAKE 50% OFF

a subscription to both Inside INdiana Business + IBJ.
Expires December 5, 2025 at midnight.

new subscribers only

GET DEAL

Already a paid subscriber? Log In

GET DEAL

CYBER WEEK SPECIAL

a subscription to both Inside INdiana Business + IBJ.
Expires December 5, 2025 at midnight.

new subscribers only

Already a paid subscriber? Log In

CYBER WEEK SPECIAL
TAKE 50% OFF

a subscription to both Inside INdiana Business + IBJ.
Expires December 5, 2025 at midnight.

new subscribers only

GET DEAL

Already a paid subscriber? Log In

GET DEAL

CYBER WEEK SPECIAL

a subscription to both Inside INdiana Business + IBJ.
Expires December 5, 2025 at midnight.

new subscribers only

Already a paid subscriber? Log In